skip to main
|
skip to sidebar
The Horseless Carriage
Following the progress of The Horseless Carriage project.
Saturday, 5 September 2009
Handrail
Done and safe.... And satin black!
Monday, 18 May 2009
Repair Finished
Boxes boxes
Bar Area
Curiosity Display Area
Repairs
repairs and fitting moldings.
Thursday, 14 May 2009
Making mouldings
First make the jigs and then make lots and lots of mouldings.
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2009
(33)
▼
September
(1)
Handrail
►
May
(9)
Repair Finished
Boxes boxes
Bar Area
Curiosity Display Area
Repairs
Making mouldings
Colour ideas
THCC Floorplan Proposal
The Piper Machine
►
April
(23)
Moonscapes
GER
Caspar
Reference
Window cushion
Holes
The other side
toy train
More Doors
Sanding
Sanding
The Roof
No doors
The doors
Up on the roof
London North Eastern Railway
Stripped
3 is the magic number!
Lost Property
Concrete Removal
Plans
The Horeseless Carriage Arrival
Snakeskin Jacket awaiting arrival
Contributors
seagulls
The Wonky Fence
Followers